Free challenge · 7 days
Ship Your First Project
A 7-day micro-challenge to kickstart momentum and publish a real build. The goal is a working link you can send someone, not a finished product.
The four steps
- 1. Pick a brief
Choose from Landing + CTA, Link Shortener, Mini RAG Notes, or Analytics Dashboard.
- 2. Scope 1 week
Set a tiny, shippable MVP. Define success in 2–3 bullet points.
- 3. Build in 5 sessions
Five 90–120 min sessions. Commit publicly (daily short log).
- 4. Demo + reflect
Record a 2–3 minute demo. Write what worked, what didn’t, what’s next.
The checklist
- Create a repo and add a short README goal
- Write a daily build log (5 entries)
- Ship an MVP and deploy
- Record a 2–3 minute demo
- Post your recap with a link
If you get stuck on the build itself, the blog has free step-by-step guides, and the Discord is where you can ask a person.
FAQ
7-day challenge questions
The questions people ask before starting, answered the same way we would in the Discord.
- Is the challenge free?
- Yes. The briefs, the steps, and the checklist are all on this page, with no signup and no email required.
- How much time does it take?
- Five build sessions of 90–120 minutes across seven days, plus a 2–3 minute demo recording at the end.
- What do I need to start?
- One of the four briefs, a code repo, a place to deploy (the Vercel free tier works), and a way to record your screen for the demo.
- What counts as finished?
- A deployed MVP, five build-log entries, and a recap post with the link. That is the whole standard; polish comes later.